Pictures Starting from the Second Phase of Scenery

The layout is coming right along. More trees have been added along with telephone poles and road signs. 

Highway department beginning to build some much needed road signs.

Electric and telephone service will be arriving soon.

Local switcher about to enter the short tunnel at Hills after crossing the Chartiers Creek.

Scenery is coming along.

Roads look a lot better with centerlines and parking spaces.  Chartpak 1/32" and 1/64" matte finished graphic tape worked out great.

Added a scratch made platform so track #2 passengers can get to and from the station.

A dangerous place until the road crews put up some signs.
Go to Pictures through the First Phase of Scenery

Go to Home Page